Redesigning the Vélodrome stadium experience to reduce waste
Line of business
Events
Work done
Strategy & design
Prototyping
Context
The Orange Vélodrome Stadium, managed by the Olympique de Marseille football club, is Marseille’s main sports facility and the second largest stadium in France.
The football club wanted to improve the recycling rate and reduce the stadium’s operating costs.
The Olympique de Marseille called Circulab to act on input flows (food & beverage, packaging), rethink the public experience and enhance outgoing waste streams.
Actions
3-step mission
- Situation analysis
- Stakeholder identification & interviews
- Operating processes analysis
- On-site observations
- Workshops and co-design
- Workshops with stakeholders
- Showcasing of inspirational initiatives
- Use of customized facilitation tools
- Co-designed solutions testing
- Recomendations draft
- Based on field tests
Results
- Situation summary
- Stakeholder mapping
- Interviews and observations report
- Action levers identified
- Terms of reference
- Summarizing all ideas from the workshops
- Providing an in-depth analysis of the field tests
- Suggesting local partnerships
Tools
- Custom-made tools
- Value Chain Canvas
- Partner Map
Project team
- Circulab
- Anne Klepper (Circulab Community member)